3.Crack Repair: Any identified cracks are repaired before the membrane installation. This may involve methods such as epoxy injection or hydraulic cement to fill and seal the cracks, preventing water intrusion.
4.Surface Preparation: The foundation surface is then prepared by cleaning it with high-pressure washing or scraping off loose materials. A smooth, dry surface is crucial for the membrane to adhere properly.