Building a construction process from stat to finish involve in any type of construction is not an easy task; perhaps it requires lots of afford and investment. Although, building construction requires lots of time and is tedious work, yet its result is a permanent asset for us. https://civiconcepts.com/blog/building-construction-step-by-step-process
building construction - 1) To acquire land or plot,2) Permission from Authorities, 3) Site preparation or leveling, 4) Excavation of foundation, 5) PPC work
Load calculation on column: 1) Column Self Weight 2) Beams Self Weight per running meter 3)load of walls per running meter 4) Weight of slab per m2
How to Check Quality of Cement on Construction Site - We must check the ISI mark printed in black color on the cement bags to ensure the quality of cement. The cement must be free from lumps.
The Standard Room Size & Location for different room of residential building or houses, Bed Room, Drawing Room, Kitchen, Guest Room, What is FAR or FSI.
Fly Ash Bricks vs Red Clay Bricks that is which is the best brick for house construction. Fly Ash Bricks has more advantages than clay bricks for new house construction.
Concrete Mix Design as per IS Code 10262 - 2019. it is method of calculating proper proportionate materials quantity that makes the required grade of concrete.
tensile strength of concrete - Importance, test methods, the ngth of concrete generally varies from 10 % to 12% of its compressive strength.
Civiconcepts Building Bye-Laws and Standard Size of Building Components - Generally, the minimum size of window is 750 mm x 1000 mm.
Which cement is best for house construction- OPC vs PPC. OPC 53 Grade cement is suitable for all RCC structures like footing, column, beam and slabs, and PPC.
In the United States, two types of standard door sizes are mostly used for home interior and exterior doors. Exterior door standard Size = 80"x 42" & Internal door size is 80" x36"
The key difference between PERT and CPM is that the the PERT is event oriented techniques and CPM is activity oriented technique. The PERT focus on time control and CPM focus on cost optimization.
The replacement of coarse aggregate in concrete can be done with Wastes of plastic, Glass rubber, Coconut shell, construction waste, Quarry dust etc. These are waste alternative materials for coarse aggregate in concrete
The formula used to calculate the unit weight of steel bars is D²/162. Where, D = Dia. Of steel bars, 162 is a constant value. There are various steel diameters used in construction are 8mm, 10 mm, 12 mm, 16 mm, 20 mm, 25 mm, 32 mm, and 40 mm.
For 1 m3 of volume of brick work calculation is 500 nos. Quantity of Cement Mortar In Brickwork and Plaster is easily calculated by using simple formula as given in this article.
Contour interval is defined as the vertical difference between any two consecutive contours. Index contour lines shows the elevation of particular location on topographic map.
BHK Full Form is one Bedroom Hall Kitchen and 2 BHK Means, 2 Bedroom, Hall & Kitchen, 1 RK means 1 Room and Kitchen only and 2BHK 2T means, 2 Bed Room, Hall & kitchen with 2 Master bed room.
For curtains, you don’t have to choose between function and style; there are many types of curtains for the home that combine functionality with gorgeous aesthetics.
The plinth area meaning is the total area of the building including interior and exterior wall, measured at floor level of the basement or at any story including balconies.
The plinth area meaning is the total area of the building including interior and exterior wall, measured at floor level of the basement or at any story including balconies.
Bhushan Mahajan who himself is a Civil Engineer by profession is also the main author and maintains the civiconcepts.com website himself. Bhushan Mahajan is also a Civil...