As-Built Drawings Procedures

It is necessary to follow a certain procedure for creating the as-built drawings in any industry, be it oil & gas, process, energy, utilities, construction or others. Listed are the curated links that highlights the same.

As-built record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has been met, thereby substantiating that the health, safety and welfare aspects of the engineering design have been adequately provided by the construction of the project.

The details of the District’s As-Built Drawing policy are outlined within this document. The policy makes numerous references to a party designated as the “Developer.” The term “Developer” is intended to refer to the project developer or property owner who is responsible for the construction of the project and the required water, electric and/or communication system improvements.

Create accurate As-Built Drawings with the correct procedure

It is necessary to follow certain procedure for creating the as-built drawings for your plant as these are the drawings that are going to help you in upgrading your plant facility in case you are thinking for the same.

Creating the As-Built Plan - Process and Procedures

ChiefExperts.com offers training, support, and design/build strategies to help designers and contractors use Chief Architect to improve their business and sell their design plans.

The purpose of this document is to provide guidance on the preparation of high quality as‐built drawings that exhibit as‐built conditions of the project.  As‐built drawings are an official record of the project at the time construction is completed.